Careers at Arise – View our open positions
The Brotorp wind farm is developed by Arise and consists of 14 wind turbines. The wind farm is located south of Blomstermåla in Kalmar County. The area consists mainly of forest. The grid connection is made through underground cable to the substation in Idhult.
Location | Mönsterås, Sweden |
Technology | Wind power |
Status | In operation |
Capacity | 46.2 MW |
Number of turbines | 14 |
Turbine model | Vestas V 126 |
Commissioned | 2015 |
Price area | SE4 |
Owner | Funds managed by Equitix |