Lebo Wind Farm was developed by Arise and is located northwest of Blankaholm in Kalmar County. The construction started in 2022 and the wind farm was inaugurated in 2024.The wind farm comprises 5 turbines and is expected to generate an average of 90 GWh annually, equivalent to the annual household electricity consumption of approximately 18,000 houses.

The area consists mainly of forest and farmland, and is situated east of the E22 highway, approximately 18 km southwest of Västervik. Grid connection is established via underground cable and overhead line to the substation in Blankaholm.

Lebo
Location Västervik, Sweden
Technology Wind power
Status In operation
Key stats
Capacity 33 MW
Number of turbines 5
Turbine Model Siemens Gamesa SG-6,6-170
Commissioned 2024
Price area SE3
Owner Arise