Lebo wind farm is located in Västervik municipality in Kalmar county, Sweden. Lebo wind farm comprises 5 wind turbines with a maximum height of 200 meters from the ground to the highest point of the rotor. The construction started in 2022 and the wind farm was inaugurated in 2024.
Owner: Arise AB
Asset Manager: Arise AB
Key Stats
Number of turbines | 5 |
Turbine model | Siemens SG-6,6-155 |
MW | 33 |
Tip height | 200m |
Annual production | 90 GWh |
Commissioned | 2024 |